Case Studies
Anne Thomas
Posted 2012-10-01 13:37 (#1133)
Subject: Case Studies


Extreme Veteran

Posts: 319
100100100
I've been the main instigator of an energy saving project for Hilton Church which I attend. We may still be changing a boiler but I've written a case study of the progress so far. I wouldn't say it's been straight forward. I think community projects are always a challenge but we've actually made some impressive savings. We should be carbon neutral for electricity over the year for the church and produce about half what the community cafe uses. Gas savings could be about 40%. I've been taking meter readings and will feel more confident about how much when we've been through the winter.

See also a case study of a Pub which borrowed an energy monitor. I still have some larger monitors available which are suitable for businesses to borrow. Email keeptheheatincampaign@gmail.com



Attachments
----------------
Attachments Hilton case study Sept 12.docx (347KB - 294 downloads)
Attachments KTHI Energy Monitor Case Study v2 (1).pdf (453KB - 238 downloads)
Top of the page Bottom of the page